Installation Instructions

GENERAL GUIDELINES

To ensure that your installation runs smoothly, it is essential to plan your project well. ECHO highlights the major issues that need to be addressed before, during and after installation.

Work in a space with a temperature between 18°C and 29°C.

Clean and clear the jobsite of any debris.

Inspect material for visible defect before and during installation.

For products in the ECHOPRO series (adhesion system), spread the adhesive with a 1/16″ V-notch trowel held at a 45˚ angle.

For underfloor heating installation, turn off the system at least 48 hours before and during floor installation, then gradually raise the temperature after 72 hours to 27 ° C (81 ° F).

Acclimatize the product for at least 48 hours before installation.

Mix tiles from dierent cartons to minimize shade variation.

Allow 3/8″ (click system) and 1/16″ (glue-down system) expansion space along walls.

For products in the ECHOPRO series (adhesion system), spread the adhesive evenly over a small area of the floor, to begin with.

For products in the ECHOEFS series (click system), offset joints by at least 8″.

COMPLETE INSTRUCTIONS AND WARRANTIES

For installation and maintenance of your floor, refer to the complete instructions below.

You will also find information about our warranties.

GLUE-DOWN SYSTEM

(Download PDF)

5G CLICK SYSTEM

(Download PDF)

PRODUCT INSTALLATIONS WITH TECHNOLOGIES 

logo-5G